MichCon Willow Run

As the General Contractor, and under a compressed eight-month schedule, we constructed three buildings on an existing Green Field and ran 3,500 feet of underground 24” and 20” gas mains for our client, MichCon/DTE.

The key building was a Compressor Station that housed a 4,700 hp reciprocating gas compressor. We also constructed the Administration and Gas Fuel Buildings. All the piping – from the large bore to the 6” – was fabricated in our Livonia fab shop and delivered to the job site for installation. This project was integral to a 24-mile 24” gas main from Monroe County to Ypsilanti.

We also engineered the design for the HVAC system including the Temperature Controls. All this work was self performed by our Sheet Metal and Controls Group. We subcontracted the Electrical, Concrete, Painting, Excavation and Structural Steel work. We completed the project ahead of schedule and on budget.

Industry: Energy

Scope: $8.1 Million