W.J. O’Neil has serviced this mall since 1995. During an expansion and upgrade in 2008/2009, we installed all the controls in the new wing and upgraded the BMS backbone to fiber optics. We also installed web servers and host PC in all wings.
We added interfaces with life safety and smoke exhaust fans as well as the sprinkler systems. We installed boiler controls for the water tower at I-96 and Novi Road.